This is noticeable! Tristan's room is all wired and insulated. Bring on the drywall!
Jackson's room is ready too!
This is looking from the top of the steps. Originally, this area was going to be walled off for an "extra room". I figured it would be storage, toy room, treadmill room, etc. However, after thinking about it, we decided to leave it open. Sort of like a "loft" area at the top of the steps. The far wall will be a large closet for storage, otherwise it will be open. A wise decision I think.
This is the master bedroom. The room straight ahead is the bathroom and the other space is a closet.
Downstairs bathroom
Looking into the kitchen. The doorway straight ahead will be the pantry, it's a very large area and I'm really excited for it. As I mentioned in a different post, we are re-purposing the porch door for the pantry door. The hallway on the left leads to the bathroom and the entry area.
As I said, Karsten has been very busy getting rooms wired and heat to them. We are hoping to do some ceiling drywall next weekend.